Am 08.08.2014 um 13:49 schrieb Ben Edwards:OK, trying to do this but if I start 4 mins in and trim 1:20 off end I get different length for audio and video. Any advice.Maybe just a display rounding problem. Video is referenced in frames, audio in samples. Carl will probably comment on this. Never used the trim feature with split video/audio content. As this is only for testing, small sync issues shouldn't be a problem, as long as it is correct for the full length version.- CarstenOn 8 August 2014 11:23, Carsten Kurz <audiovisual@t-online.de> wrote:
Am 08.08.2014 um 12:15 schrieb Ben Edwards:
That will be the problem - when you insert video and audio separately, you need to trim ALL files that need to run in parallel with the same parameters. If one is left untrimmed, DCP-o-matic will create a full length DCP with the remaining trimmed audio and video tracks padded with silence and/or blacks.
> Latest version, downloaded it a few days ago. The audio was 5.1 added as 6 separate files. When I tried to create first 15 minutes last time and it did whole film I was doing the same thing and sync was OK. I did however have to reimport all the media as when I reloaded project it would not work so I deleted all the media and imported.
- Carsten
_______________________________________________
DCPomatic mailing list
DCPomatic@carlh.net
http://main.carlh.net/cgi-bin/mailman/listinfo/dcpomatic
--
Ben Edwards, Video Editor and Cameraman
web:www.nkytwig.com mobile:07773 02 44 82 skype:funkytwig twitter:@funkytwig
iContact Community Video | Bristol Community Channel
_______________________________________________
DCPomatic mailing list
DCPomatic@carlh.net
http://main.carlh.net/cgi-bin/mailman/listinfo/dcpomatic